My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-30_REVISION - M1987013 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987013
>
2012-03-30_REVISION - M1987013 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:27 PM
Creation date
4/2/2012 10:44:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987013
IBM Index Class Name
REVISION
Doc Date
3/30/2012
Doc Name
New Conversion Application
From
Southway Construction Company, Inc.
To
DRMS
Type & Sequence
CN1
Email Name
SSS
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Extraction of the resource will be accomplished with front -end loaders, dozers, track <br />excavators, or any surface mining type of equipment that is economically feasible for <br />this site. <br />Earthen berms will be constructed where needed to keep the stormwater from running <br />uncontrolled, preventing sedimentation in the historical water drainages. Water <br />diversions and impoundments will be done in a way to prevent erosion and <br />sedimentation. This will be part of the stormwater management plan. During all <br />phases, Best Management Practices must and will be followed. <br />Mining and construction equipment designed for open pit mining will be used for all the <br />earth moving and extraction of materials. Mining excavation will move northeast in the <br />pit area. The mining will be done in such a manner as to minimize any high walls will <br />be approximately 25 feet high or less. The pit highwalls will be left at a 1/2 H: 1V or <br />flatter if the terrain permits. <br />The timetables are dependent upon market conditions. The mining timetable is as <br />follows: <br />Estimated life of the pit is another 7 to 10 years which will be between <br />2018 —2021. <br />ALL DATES ARE DEPENDENT ON MARKET DEMAND. <br />(g) Ripraps along with structural fill (crushed rock) are the main (primary) <br />commodities to be mined. There are no other commodities to be mined only <br />construction aggregates. <br />(h) Products form this mine site will be used for construction materials as <br />defined by the DMG, as follows: "Construction Materials" means rock, <br />clay, silt, sand, gravel, limestone, dimension stone, marble or shale extracted <br />for use in the production of non - metallic construction products. <br />(i) Explosives will be used during mining or reclamation. This site has been <br />mined in this fashion from the beginning and no adverse affects. Blasting is <br />suitable for this rock outcrop. <br />
The URL can be used to link to this page
Your browser does not support the video tag.