Laserfiche WebLink
Page 9 of 9 <br />directly to the area No. 1 Pit <br />impoundment. One exceedance <br />for TSS and Iron was observed at <br />the No.1 Pit discharge, Outfall <br />005A in 2011. <br />Ground water — No material <br />damage has occurred, as discussed <br />in item 21, above. <br />24. Agreement of <br />CDRMS regulation <br />observed hydrologic <br />2.05.6(3) and <br />impacts with "probable <br />requirement to keep <br />hydrologic <br />YES <br />consequences „ <br />current, CDRMS <br />projected in mining <br />regulation 2.03.3(1) <br />25. Adequacy of <br />CDRMS regulation <br />ground water <br />4.05.13(1) <br />YES <br />monitoring program <br />26. Adequacy of <br />CDRMS regulation <br />surface water <br />4.05.13(2) <br />YES <br />monitoring program <br />