My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-07-31_PERMIT FILE - M2002004
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2002004
>
2002-07-31_PERMIT FILE - M2002004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 2:18:42 PM
Creation date
3/27/2012 4:01:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
PERMIT FILE
Doc Date
7/31/2002
Doc Name
APPROVAL OF A 112 PERMIT APPLICATION OVER OBJECTIONS
From
GCC RIO GRANDE
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Applicant, GCC Rio Grande <br />Pre - Hearing Statement <br />July 30, 2002 <br />Page 5 <br />maps, drawings, calculations, narrative and any other materials from the mining permit <br />application in providing testimony at the hearing. <br />K. James Gill, P.E. <br />Contour Engineering <br />P.O. Box 555 <br />Morrison, CO 80465 <br />Phone: 303 - 697 -2655 <br />Mr. Gill is a geotechnical engineer. Mr. Gill will be available to provide testimony <br />regarding stability of foundations for structures, mining and reclamation activities at the Red <br />Rock Plant and Mine. Mr. Gill may rely upon maps, drawings, calculations, narrative and any <br />other materials from the mining permit application in providing testimony at the hearing. <br />L. In addition to the above -noted technical presentations concerning the issues raised in the <br />Pre - Hearing Order of June 7, 2002, the undersigned counsel for GCC Rio Grande may make <br />presentations on legal and/or policy issues. <br />M. Consistent with the Pre - Hearing Order, GCC Rio Grande anticipates the need to offer <br />rebuttal testimony. Therefore, GCC Rio Grande reserves the right to designate additional <br />witnesses; any of the above -noted witnesses may offer rebuttal testimony, as may be needed, to <br />respond to the testimony made by the Division of Minerals and Geology or other parties to the <br />proceeding. Rebuttal witnesses may rely upon maps, drawings, calculations, narrative and any <br />other materials from the mining permit application in providing testimony at the hearing. <br />III. TIME ALLOCATION <br />The Pre - Hearing Order of June 7, 2002, provides that GCC Rio Grande shall have 50 <br />minutes to make a presentation to the Mined Land Reclamation Board. GCC Rio Grande shall <br />also have 45 minutes to cross - examine witnesses and make a rebuttal statement. Finally, GCC <br />Rio Grande shall have 20 minutes to make a closing statement. <br />GCC Rio Grande respectfully reserves the right to request additional adequate time for <br />any new issues that may arise. <br />IV. EXHIBITS <br />GCC identifies the following exhibits for use at the hearing: <br />Exhibit A: Expert Resources and Documents on Blasting <br />{81408:3} <br />
The URL can be used to link to this page
Your browser does not support the video tag.