My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-13_APPLICATION CORRESPONDENCE - C2010089 (2)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010089
>
2012-01-13_APPLICATION CORRESPONDENCE - C2010089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:25 PM
Creation date
3/23/2012 12:31:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Application Correspondence
Doc Date
1/13/2012
Doc Name
Preliminary Adequacy Review No. 3 (Emailed)
From
Marcia Talvitie
To
Murari Shrestha
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C -2010 -089 PARNos. 1- 1A -1B, 2- 2A -2B, 3 <br />New Horizon North Mine Page 41 of 60 <br />notification envelope to include all structures within '/2 mile of the proposed NHN permit <br />area. Itent resoN d in 11ay -2# 1 re imnse. <br />2.05.4 — Reclamation Plan <br />2.0 .4(2)(a) Reclamation timetable <br />1. A general description of the reclamation timetable has been provided by WFC, with <br />references made to other subsections of 2.05.4. However, no details have been provided <br />about reclamation of the haul roads, removal of the facilities, relocation of the CC Ditch, etc, <br />Please provide a detailed reclamation timetable in accordance with 2.05.4(2)(a). Item <br />r °iso&ed in !il v -201I response. <br />2 Os. 4(2) (b) Reclamation cost e,s hvate <br />1. In Section 2.05.4(2)(b), the PAP states that a copy of the reclamation documents is included <br />in Section 3.02.2. WFC has not submitted a reclamation cost estimate. Reclamation costs <br />will be evaluated by Division in a later stage of the permit adequacy review process. <br />DBMS: The Division's RCE will be included when it is completed. <br />2 0.x.4(2)0 Backfilling, Soil S'tabihzing, compacting, grading, po3't n ining coy ?tot -mv, Strean] <br />charnel reconstruction, and toad tentoval or modification <br />Post - mining contour map 2.05.4 -1 shows the proposed final contours. This map shows the <br />overburden box -cut stockpile, the topsoil stockpile, and sediment ponds NHN -001, NHN- <br />002, and NHN -003 remaining as permanent features. This final configuration is not in <br />agreement with Section 34- 33- 120(2)(c) and Rule 4.14(2)(a) and (d), and 4.14;2(1). Please <br />provide a map that shows the final post- mining contours of the facilities area including the <br />temporary box-cut spoil stockpile and the topsoil stockpile. Haul roads, mine facilities, and <br />years of mining should also be deleted from this map. If the ponds are to remain as <br />permanent features, please provide the appropriate demonstrations required by Rule <br />4.05.9(13). Item reso&ed in Aft = -2011 r °esl onse. <br />2. Please include a legend on Map 2.05.4 -1. It nt resolved in 11fay- 2011 resj)onsc� <br />3. The post - Whiling contours on map 2.05.4 -1 show smooth straight slopes in the Gainey, <br />Meehan and Glasier properties. This map does not show where drainage ways will be <br />reestablished. The Division has 30 +years of experience with observing reclaimed slopes <br />and has noted that smooth straight slopes exhibit more erosion and gullying that reclaimed <br />slopes with undulations and slope variations. Please discuss why there are no erosion <br />control ditches or terracing proposed for the reclaimed slopes. Please submit post - mining <br />contours that have contours that more closely resemble the approximate original contours, <br />4.14.2(1). Item resolted in 1 ltty -2011 resImnse. <br />4. Three cross sections have been provided on Map 2.05.4 =1, depicting the pre - mining ground <br />surface and the proposed post- mining surface. <br />a) Each of the sections provided pins East -West. Please add at least one cross section <br />which runs North - South across the permit area. Item resolved in Al y -21111 restyounse. <br />
The URL can be used to link to this page
Your browser does not support the video tag.