My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-13_APPLICATION CORRESPONDENCE - C2010089 (2)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010089
>
2012-01-13_APPLICATION CORRESPONDENCE - C2010089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:25 PM
Creation date
3/23/2012 12:31:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Application Correspondence
Doc Date
1/13/2012
Doc Name
Preliminary Adequacy Review No. 3 (Emailed)
From
Marcia Talvitie
To
Murari Shrestha
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C -2010 -089 PARNos. 1- IA -IB, 2- 2A -2B, 3 <br />New Horizon North Mine Page 40 of 60 <br />A reference was added as requested. Please change the font for the section header to Bold; <br />consistent with the format of the surrounding paragraphs. Item reiw& d in Dec-2011 <br />resj)onse. <br />2. In accordance with the requirements of 2.05.3(5), please also specify the volume(s) of <br />topsoil to be stockpiled and incorporate this information into the PAP text and map. Please <br />describe the methods that will be used to achieve compliance with the topsoil storage <br />requirements of 4.06.3. <br />The May- 2011 cover letter gives an estimated topsoil volume of 430,000 bank cubic yards. <br />However, this information does not appear in the application text and maps. Please revise <br />the text and maps to give the volume and location of any proposed topsoil or subsoil <br />stockpile locations. It nt resoh,ed in Dee-2011 resImnse.. <br />2.05.3 ((6) Overburden <br />As with 2:05.3(5); above, the PAP does not provide a narrative specific to Rule 2:05.3(6): <br />Please revise the application to address the requirements of 2.05.3(6), or clearly reference <br />the location where the information may be found. <br />A reference was added as requested. Please change the font for the section header to Bold, <br />consistent with the format of the surrounding paragraphs. Item reso ,eel in Dee-20-11 <br />2. 2.05. (6) also addresses the requirements for temporary overburden disposal (storage) <br />structures. Please note that the proposed overburden stockpile must comply with the <br />applicable performance standards of Rule 4.09.1_ Please revise the PAP to address these <br />requirements. <br />, <br />e u <br />s <br />p <br />"no <br />& <br />pri <br />3. z <br />4. Rule 4.08:2(1) requires that owners of structures within '/2 mitre of the permit area <br />(emphasis added) be notified. The blast notification envelope circumscribed on Map <br />2.05.3(6)(a) -I appears to have been deterinined using the blasting area. Please revise the <br />
The URL can be used to link to this page
Your browser does not support the video tag.