Laserfiche WebLink
` f-imt sss <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />y _ o MINERALS PROGRAM INSPECTION REPORT <br />PHONE: (303) 866 -3567 <br />1876 <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: <br />MINE /PROSPECTING ID #: <br />MINERAL: <br />COUNTY: <br />Farnsworth Gr Pit 2 <br />M -1982 -154 <br />Sand and gravel <br />Delta <br />INSPECTION TYPE: <br />INSPECTOR(S): <br />INSP. DATE: <br />INSP. TIME: <br />Monitoring <br />Travis H. Marshall <br />March 6, 2012 <br />10:30 <br />OPERATOR: <br />OPERATOR REPRESENTATIVE: <br />TYPE OF OPERATION: <br />Farnsworth Construction and Gravel Compan <br />Mr. & Mrs. Farnsworth <br />110c - Construction Limited Impact <br />REASON FOR INSPECTION: <br />BOND CALCULATION TYPE: <br />BOND AMOUNT: <br />Normal I &E Program <br />Complete Bond <br />$2,271.00 <br />DATE OF COMPLAINT: <br />POST INSP. CONTACTS: <br />JOINT INSP. AGENCY: <br />NA <br />None <br />None <br />WEATHER: <br />INSPECTOR'S SI_G <br />SIGNATURE DATE: <br />Cloudy <br />L:-----2L; <br />March 13, 2012 <br />The followinp- inspection tonics were identified as havinp- Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Min_ edL_ and_ <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Signs & Markers <br />PROBLEM /POSSIBLE VIOLATION: Problem: The affected area boundary markers are missing or incorrectly <br />placed. This is a problem for failure to maintain boundary markers around the affected area as required by <br />Section 3.1.12(2) of the rule. <br />CORRECTIVE ACTIONS: The operator shall conduct a survey and replace the boundary markers in the correct <br />location(s). The operator shall provide proof to the Division that this has been done by the corrective action <br />date. <br />CORRECTIVE ACTION DUE DATE: 4/12/12 <br />MAR <br />Div- <br />Minin9 <br />Safety <br />Page 1 of 3 <br />