Laserfiche WebLink
serves only reclaimed sites and has been closed by the U. S. Forest Service. An exploratory <br />prospect may be put in between Sites 1 and 2 on the Ute. <br />Site visits, including mineral extraction, reclamation, and claim maintenance will be continued <br />throughout the season. <br />Proposed 2012 Disturbances: <br />Proposed operations for 2012 at Site 6 on the Two Point Claim will open the site approximately <br />0.1 acre. Site 7 will be opened approximately 0.1 acre. Site 13 (Site N) on Qui -Buc No. 1 will be <br />opened for approximately 0.05 acre. Otherwise, prospects will be limited to 0.02 acre, filled, and <br />reseeded. <br />Proposed 2012 Reclamation: <br />All sites and prospects opened during 2012 will be closed and reclaimed, except possibly a small <br />portion of Site 13 (Site N) on Qui -Buc No. 1 and Site 6 on the Two Point Claim. If so, these sites <br />will be made safe for winter. <br />All sites and prospects opened and closed during 2012 will be reseeded with native grasses. <br />Sufficiency of Bond: <br />A reclamation bond of $ 2,200 was set aside in 1993 to cover annual operations and disturbances <br />under s mining permit. Additionally, a bond for $11,190 covering roads for this operation and <br />tw other operations is set aside with the U.S.F.S. <br />Respectfully submitted, <br />dH L. DORRIS <br />Operator, Crystaljack Mining <br />2 Attch. <br />1. Site maps <br />2. Reclamation photos <br />