My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-12_PERMIT FILE - M2011028
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011028
>
2012-03-12_PERMIT FILE - M2011028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:04 PM
Creation date
3/16/2012 3:33:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011028
IBM Index Class Name
PERMIT FILE
Doc Date
3/12/2012
Doc Name
RESPONSE TO ADEQUACY REVIEW
From
FOUR CORNERS MATERIALS
To
DRMS
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Temporary berms <br />4. Temporary diversion dike and ditch (DD) <br />5. Temporary slope drains (TSDs) <br />6. Inlet protection (IP) - straw bale (StB), silt fence (SF), sediment control log (SCL), <br />gravel bag (GB), and filter fabric (FF) and ERTEC <br />7. Sediment control logs (SCL) <br />8. Silt fence (SF) <br />9. Straw bale barriers (StB) <br />10. Rock filter berm (RFB) <br />11. Check dams - straw bale, sediment control log, rock <br />12. Slope stabilization - soil retention blankets (SRB) <br />13. Temporary stabilization - temporary seeding (TS), mulching (MU) (i.e., hydro - <br />mulching, crimped straw, or wood chips), tactifier, and SRB <br />14. Surface roughening (SR) <br />15. Grubbing limits will be established prior to any site disturbance and will be <br />clearly marked and visible. <br />16. Existing vegetative ground cover will be preserved until such a time that the <br />production schedule dictates removal of the ground cover. <br />• Vertical Construction (Very Minimal Construction) <br />1. Sediment trap (ST) <br />2. Sediment basin (SB) <br />3. Temporary berms <br />4. Temporary diversion dike and ditch (DD) <br />5. Sediment control logs (SCL) <br />6. Silt fence (SF) <br />7. Straw bale barriers (StB) <br />8. Check dams (CD) - straw bale (StB), sediment control log (SCL), rock <br />9. Grubbing limits will be established prior to any site disturbance and will be <br />clearly marked and visible. <br />10. Existing vegetative ground cover will be preserved until such a time that the <br />production schedule dictates removal of the ground cover. <br />• Final grading <br />1. Sediment trap (ST) <br />2. Inlet protection (IP) - silt fence (SF), sediment control log (SCL), gravel bag (GB), <br />filter fabric (FF) and ERTEC <br />3. Outlet protection (OP) - rock and soil retention blanket (SRB) <br />4. Sediment control logs (SCL) <br />5. Silt fence (SF) <br />6. Straw bale barriers (StB) <br />7. Check dams (CD) - straw bale (StB), sediment control log (SCL), rock <br />Animas Glacier SWMP February 2012 <br />p. 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.