My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-28_REVISION - M1980244 (85)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2012-02-28_REVISION - M1980244 (85)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:49:13 PM
Creation date
3/15/2012 3:34:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
2/28/2012
Doc Name
VOL 7, Part 4: Cyanide Mgmt Code Recertification Audit
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Placement of new utility lines in the proposed Phase 5 area and modification of <br />the proposed Phase 5 closure drain location; <br />• Implementation of the Hydro -Jex© system; <br />• Design of proposed, permanent carbon train (E Train); <br />• Extension of geomembrane liner at the Load Out Bin; <br />• Completion of liner repairs at the VLF (Phase IV area); <br />• Installation of new liner along the northwest edge of the VLF (Phase IV area); <br />• Relocation of the Load Out Bin; and <br />Recertification of existing liner. <br />In addition to the above projects, CC &V added a new 910 kW diesel - powered generator <br />at the ADR Plant. The generator came on line in September 2009. Construction of the <br />Phase 5 extension project was ongoing during this onsite recertification audit. <br />CC &V provided documentation demonstrating that Quality Assurance and Quality <br />Control (QA/QC) programs were implemented during construction of these projects. <br />Projects involving minor modifications to the cyanide facilities are documented in the <br />Technical Revision applications and approvals pursuant to the Mining and Reclamation <br />Permit. For projects involving new construction of the VLF liner system, formal <br />construction reports were issued by the design engineers (i.e., Professional engineers <br />registered in the State of Colorado), which address all materials and relevant construction <br />methods. <br />CC &V retained the original QA/QC documentation for cyanide facilities constructed <br />prior to and subsequent to the June 2007 ICMC certification audit. The documentation <br />resides in the office of the Manager, Environmental Resources, in hardcopy format. <br />4.9 Implement monitoring programs to evaluate the effects of cyanide use on <br />wildlife, surface and ground water quality. <br />The operation is: <br />• in full compliance <br />in substantial compliance <br />❑ not in compliance...with Standard of Practice 4.9. <br />Describe the basis for the Finding/Deficiencies Identified: <br />CC &V has prepared and implemented written standard procedures for monitoring <br />activities to evaluate the effects of cyanide use on wildlife and water quality. These <br />include the Environmental Sampling Protocol Guide, which provides the procedures for <br />Cresson Project v September 22, 2010 <br />Name of Mine Signature of Lead Auditor Date <br />Page 20 of 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.