My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-28_REVISION - M1980244 (75)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2012-02-28_REVISION - M1980244 (75)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:49:12 PM
Creation date
3/15/2012 1:49:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
2/28/2012
Doc Name
VOL 5, Appendix H: Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
carried out on a 100 -foot by 100 -foot grid with additional survey points required to define valley <br />leach facility topographic features (i.e., toe of slope, crest of slope, breaks in grade), unless otherwise <br />directed by MANAGER. The Record Drawings shall include elevations and locations for the <br />following: <br />• Underdrain plan view showing the limits of the valley leach facility. Underdrain Fill <br />and underdrain alignment, with elevations every approximately 100 feet or on every <br />break in grade <br />• Diversion channel plan and profile view along the diversion channel alignment <br />• Leak detection trench plan view showing the limits of the valley leach facility, leak <br />detection trench alignment, and leak detection sumps, with elevations every <br />approximately 100 -feet <br />• Perimeter access roads <br />• Top of Upper geosynthetics in the Pregnant Solution Storage Area, including the <br />Vertical Riser Sump and base plates <br />• High Volume Solution Collection piping plan showing the limits of the VLF, and <br />piping alignment with elevation every approximately 100 -feet <br />In addition, the Colorado licensed surveyor will provide a surveyor's certificate to be submitted in the <br />Construction Certification Report. <br />C. Submittal: <br />Soil Liner Fill plan view showing the limits of the valley leach facility, with <br />contours of the Soil Liner Fill and Bedding Fill surface on a 10 -foot contour interval, <br />including the regraded ore slopes and end berms <br />Low Volume Solution Collection piping plan showing the limits of the composite <br />liner, double liner and single liner, and piping alignment with elevations every <br />approximately 100 feet <br />CONTRACTOR will submit completed as -built documentation within seven (7) calendar days upon <br />completion of the work in the following manner: <br />1. Submit two (2) hard copies to the MANAGER. <br />2. Submit two (2) non - reproducible copies to the MANAGER in electronic form on <br />compact disks (CD) or DVD's and in an AutoCAD compatible format. <br />D. The CONTRACTOR will be responsible for performing the following survey activities associated <br />with the Construction Certification Report: <br />1. Provide northing, easting, and elevation for all Soil Liner Fill depth verifications. <br />2. Provide northing, easting, and elevation for geomembrane panel intersections and <br />destructive samples. <br />Section 01050 Page 2 of 3 January 14, 2011 <br />Construction Staking Revision 0 <br />S \Protects \1125G Squaw Gulch Valley Leach Facililty Design \I - Tech Specs \01050 r1 doc <br />amec9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.