My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-28_REVISION - M1980244 (75)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2012-02-28_REVISION - M1980244 (75)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:49:12 PM
Creation date
3/15/2012 1:49:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
2/28/2012
Doc Name
VOL 5, Appendix H: Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01050.0 CONSTRUCTION STAKING AND CONSTRUCTION DOCUMENTATION <br />PART 1: GENERAL <br />1.01 SUMMARY: <br />1.04 STAKING: <br />amecc <br />This Section defines the control staking services required by the CONTRACTOR. All staking and surveying <br />will be the responsibility of the CONTRACTOR unless otherwise specifically defined in this section. All <br />grade checking and transferring of lines and grades from CC &V's stakes will be the CONTRACTOR'S <br />responsibility. <br />1.02 CONTROL STAKES: <br />Control stakes which are reference points for all construction work will be conspicuously marked. It shall be <br />the responsibility of the CONTRACTOR to inform his employees and his subcontractors of their importance <br />and the necessity for their preservation. At least forty-eight (48) hours written advance request for removal of <br />control stakes shall be given to CC &V. A total of ten (10) control stakes will be provided to the <br />CONTRACTOR by CC &V for this work. <br />Control stakes shall be set one time only. <br />1.03 FLAGGING CODE: <br />A color code will be established by the CONTRACTOR during the course of the project indicating specific <br />colors for the various kinds of stakes to be set. <br />A. CC &V will provide vertical and horizontal reference control stakes in the proximity of the work as <br />discussed in Article 1.02 of this Section. <br />B. The CONTRACTOR shall be responsible for setting construction and grade stakes and for proper <br />preservation of control points. <br />C. The CONTRACTOR will provide as -built coordinates and elevations for the Underdrains, Leak <br />Detection system, Low Volume Solution Collection piping and High Volume Solution Collection <br />piping or as requested by the MANAGER. <br />1.05 CONSTRUCTION CERTIFICATION DOCUMENTATION: <br />A. The CONTRACTOR shall be responsible for accurately surveying the locations and elevations, and <br />where applicable, the type, thickness, and geometry of any and all pipes and fittings, ditches, <br />geosynthetic materials, breaks in fill or cut slopes, general grading, change in fill or synthetic <br />material type, and any other aspect of the work to facilitate construction and as required by the <br />MANAGER. <br />B. Submittals By CONTRACTOR Upon Completion of Work: <br />Within seven (7) calendar days after completion of the WORK, CONTRACTOR shall furnish <br />MANAGER with "Record Drawings" (also referred to as "As -Built Drawings ") of the Work. The <br />Record Drawing will be drawn at a scale of 1 -inch equals 100 feet with 10 foot topographic contour <br />interval, and on a 24 -inch by 36 -inch sheet. All surveying Record Drawings shall be signed and <br />sealed by the Colorado licensed surveyor who directed the work. The required surveying shall be <br />Section 01050 Page 1 of 3 January 14, 2011 <br />Construction Staking Revision 0 <br />S \Projects \1125G Squaw Gulch Valley Leach Facililty Design \I - Tech Specs \01050 rl doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.