Laserfiche WebLink
7.06 CONSTRUCTION CERTIFICATION REPORT: <br />Section 01400 1 Page 8 of 10 January 14, 2011 <br />Earthworks CQA Plan Revision 0 <br />At the completion of the project, the CQA Monitor shall submit to MANAGER a Construction Certification <br />Report. This report shall certify that the work has been performed in compliance with the DRAWINGS and <br />SPECIFICATIONS and will contain the following information: <br />• summary of all construction activities; <br />• photographic documentation; <br />• test data sheets; <br />• copies of weekly reports; <br />■ CQA test results, including date, test locations and resolutions of deficient test results; <br />• copies of surveyors certificate; <br />■ fill temperature monitoring results; <br />• staff schedule summary; <br />• a description of significant construction problems and the resolution of these problems; <br />• changes to the DRAWINGS or SPECIFICATIONS and the justification for these changes; <br />• record drawings, and <br />• a statement certifying that construction was completed in compliance with the DRAWINGS <br />and SPECIFICATIONS, signed, and sealed by the CERTIFYING ENGINEER registered in <br />the State of Colorado. <br />S \Protects \1125G Squaw Gulch Valley Leach Facililty Design \I - Tech Specs \01400 1 r0 doc <br />ame0 <br />