Laserfiche WebLink
February 7, 2007 -10- 063 -2140 <br />4.0 CLOSING <br />Within the limitations of scope, budget, and schedule, the analyses, conclusions, and <br />recommendations presented in this report were prepared in accordance with generally accepted <br />professional geotechnical engineering principles and practices in this area at the time this report was <br />prepared. The recommendations and conclusions in this report are based on data obtained from visual <br />observations of surface features. Surface reconnaissance may not identify all relevant features. <br />Variations from the conditions encountered and actual subsurface conditions inferred may occur. For <br />this reason, involvement by a qualified geotechnical engineering firm, experienced in the technical <br />issues identified as pertinent to this project, through fmal design and construction is highly <br />recommended. <br />This report was prepared for the exclusive use of CC &V for specific application to the design of the <br />site as it relates to the geotechnical aspects discussed herein. The data and report should be provided <br />to prospective contractors for their information; however, our report, conclusions, and interpretations <br />should not be construed as a warranty of actual subsurface conditions. <br />Golder appreciates the opportunity to provide support to CC &V for the Squaw Gulch VLF extension <br />project. If you have questions regarding the information contained herein, please contact us at <br />(303 980 -0540. <br />Sincerely, <br />GOLDER ASSOCIATES INC. <br />>,4 edA <br />David Geier <br />Staff Engineer <br />1. 1. ,.HIMSTW o RICMS.NL -0, TPRI_ oRICA WORMOS -FN ,mC Golder Associates <br />Brent R. Bronson, P.E. <br />Senior Project Manager <br />Principal <br />