My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-13_INSPECTION - C1982056
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2012-03-13_INSPECTION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:07 PM
Creation date
3/15/2012 7:42:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
3/13/2012
Doc Name
Inspection Report
From
DRMS
To
Jerry Nettleton
Inspection Date
3/6/2012
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 6, 2012 C -1982- 056 /Foidel Creek Mine JDM <br />Concrete pumping at 16LT borehole <br />OTHER (SPECIFY): <br />This was a complete coal inspection of the Foidel Creek Mine conducted by Jason Musick of CDRMS. Brian <br />Watterson of TCC accompanied the inspection. The weather was clear, site snow- covered and accessible roads <br />were wet and muddy during the inspection. <br />PROCESSING WASTE /COAL MINE WASTE PILES — Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization, Placement: <br />Refuse material continues to be placed in the RDA expansion area. Material has been stockpiled at the toe of the <br />RDA expansion area with evidence of grading having been conducted during the inspection. The RDA was well <br />compacted and stable at the time of the inspection. The refuse material had not yet reached the head of the under - <br />drain of the RDA. The exposed under -drain was stable and constructed as designed. <br />ROADS — Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br />The 6NM, 18LT, and Fish Creek Borehole access roads were wet and muddy at the time of the inspection. Access <br />roads were stable and in good condition at the time of the inspection. The construction of the 16LT utility <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 4 of 9 <br />Stockpiled processing waste at north end of RDA <br />Graded and compacted processing waste at RDA <br />
The URL can be used to link to this page
Your browser does not support the video tag.