My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-13_INSPECTION - C1982056
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2012-03-13_INSPECTION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:07 PM
Creation date
3/15/2012 7:42:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
3/13/2012
Doc Name
Inspection Report
From
DRMS
To
Jerry Nettleton
Inspection Date
3/6/2012
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 6, 2012 C -1982- 056 /Foidel Creek Mine JDM <br />ko <br />Sump to pond B relief ditch <br />Access road sump inlet Relief ditch to pond B inlet <br />All spillways were functioning as designed with no problems noted. <br />Ditches and culverts throughout the mine site were functioning as designed. No problems were noted with the <br />exception of the following: <br />- The sump located northwest of Pond B has neared capacity in terms of sediment. This sump should be cleaned <br />when dryer conditions dictate to ensure adequate freeboard is maintained. <br />-The culvert at the intersection of the explosives area access road was damaged at the inlet. <br />-The culvert located to the north of the ROM stockpile and behind the vent fan was 3 /4 full of sediment at the inlet <br />GENERAL MINE PLAN COMPLANCE: <br />A longwall move has been initiated at the time of the inspection. One '120 car coal train was in the process of <br />loading at the time of the inspection. <br />Concrete pumping was being conducted at the 16LT utility borehole at the time of the inspection. Jerry Nettleton <br />of TCC stated that the concrete pumping has been completed as of 3/7/2012. <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 3 of 9 <br />Pond B access road runoff to sump <br />
The URL can be used to link to this page
Your browser does not support the video tag.