Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company Squaw Gulch Valley Leach Facility Design <br />A surface water diversion system, including operation and post - operational diversion ditches, <br />has been designed for the Squaw Gulch VLF. It is sized to divert upgradient surface water <br />flows generated from the 100 - year /24 -hour storm event. As needed, temporary ditches will be <br />constructed during operations along the edge of the perimeter access road and elsewhere to <br />convey runoff from the minor watersheds between the edge of the VLF and the ultimate <br />diversion channels. <br />Project No.: 74201125G0 vi <br />1 September 2011 <br />amecG <br />