Laserfiche WebLink
Month <br />( <br />( <br />( <br />( <br />Total Depletions <br />Full Build-Out <br />Total Depletion Rate <br />(Input to Glover <br />Analysis) <br />Lagged Depletions <br />(Appendix E) <br />Gosney Pump <br />Requirements Due to <br />Irrigation Season Out-Of- <br />Priority Depletions <br />(acre feet) <br />(gallons per minute) <br />(acre feet) <br />(cubic feet per second) <br />Jan <br />0.00 <br />0.00 <br />1.05 <br />0.00 <br />Feb <br />1.85 <br />13.74 <br />2.15 <br />0.00 <br />Mar <br />5.83 <br />43.36 <br />5.20 <br />0.00 <br />Apr <br />10.83 <br />80.55 <br />9.41 <br />0.00 <br />May <br />15.98 <br />118.93 <br />14.03 <br />0.23 <br />Jun <br />21.35 <br />158.83 <br />18.96 <br />0.32 <br />Jul <br />19.79 <br />147.23 <br />18.81 <br />0.31 <br />Aug <br />14.66 <br />109.07 <br />15.11 <br />0.25 <br />Sep <br />12.43 <br />92.49 <br />12.96 <br />_ <br />0.22 <br />Oct <br />7.09 <br />52.75 <br />8.63 <br />0.14 <br />Nov <br />3.10 <br />23.10 <br />4.84 <br />0.00 <br />Dec <br />0.00 <br />0.00 <br />1.75 <br />0.00 <br />Totals 1 <br />112.9 <br />112.9 <br />Table 6 <br />Four Corners Materials - Bayfield Gravel Operation <br />Lagged Depletions and Water Replacement Requirement for Full Build -Out <br />Column Notes <br />(1) Depletions after Full Build -Out, See Table 4, Column (7). <br />(2) Depletion rate for input to Glover Analysis. <br />(3) Equals the lagged depletions from the edge of the gravel pit to the Pine River (200 ft) based on the Glover <br />Analysis, see Appendix E. <br />(4) Equals Column (3) x 43,560 cubic feet per acre foot ! (number of days per month x 86,400 seconds per day). <br />KMemA103•1.•11 1f -MM5W UVIS.M -- 11011\1.10., MamieIt 1.LL10111 <br />y0- a1a,4,IMAMMIseu 1. <br />Wright Water Engineers, Inc. <br />March 2011 <br />Des by: wcr <br />Ckd by: PRF <br />