Laserfiche WebLink
Month <br />( <br />( <br />( <br />( <br />Total Depletions <br />Total Depletion Rate <br />(Input to Glover <br />Analysis) <br />Lagged Depletions <br />Gosney Pump <br />Requirements Due to <br />Irrigation Season Out - <br />of- Priority Depletions <br />(acre -feet) <br />(gallons per minute) <br />(acre -feet) <br />(cfs) <br />Jan -11 <br />0.44 <br />3.30 <br />1.22 <br />0.00 <br />Feb-11 <br />1.77 <br />13.20 <br />2.01 <br />0.00 <br />Mar -11 <br />4.69 <br />34.86 <br />4.23 <br />0.00 <br />Apr -11 <br />8.38 <br />62.39 <br />7.34 <br />0.00 <br />May -11 <br />12.16 <br />90.47 <br />10.73 <br />0.17 <br />Jun -11 <br />16.28 <br />121.16 <br />14.49 <br />0.24 <br />Jul -11 <br />15.15 <br />112.73 <br />14.41 <br />0.23 <br />Aug -11 <br />11.43 <br />85.03 <br />11.74 <br />0.19 <br />Sep -11 <br />9.58 <br />71.27 <br />10.00 <br />0.17 <br />Oct -11 <br />5.67 <br />42.20 <br />6.81 <br />0.11 <br />Nov -11 <br />2.71 <br />20.15 <br />4.00 <br />0.00 <br />Dec -11 <br />0.45 <br />3.38 <br />1.74 <br />0.00 <br />2011 Totals <br />88.7 <br />88.7 <br />Jan -12 <br />0.44 <br />3.30 <br />1.22 <br />0.00 <br />Feb -12 <br />1.77 <br />13.20 <br />2.01 <br />0.00 <br />Mar -12 <br />4.69 <br />34.86 <br />4.23 <br />0.00 <br />Apr -12 <br />8.38 <br />62.39 <br />7.34 <br />0.00 <br />May -12 <br />12.16 <br />90.47 <br />10.73 <br />0.17 <br />Jun-12 <br />16.28 <br />121.16 <br />14.49 <br />0.24 <br />Jul -12 <br />15.15 <br />112.73 <br />14.41 <br />0.23 <br />Aug -12 <br />11.43 <br />85.03 <br />11.74 <br />0.19 <br />Sep -12 <br />9.58 <br />71.27 <br />10.00 <br />0.17 <br />Oct -12 <br />5.67 <br />42.20 <br />6.81 <br />0.11 <br />Nov -12 <br />2.71 <br />20.15 <br />4.00 <br />0.00 <br />Dec-12 <br />0.45 <br />3.38 <br />1.74 <br />0.00 <br />2012 Totals <br />88.7 <br />88.7 <br />Table 5 <br />Four Corners Materials - Bayfield Gravel Operation <br />Lagged Depletions and Water Replacement Requirement for Year 3 & 4 <br />Column Notes <br />(1) Depletions, see Table 3, Column (5). <br />(2) Depletion rate for input to Glover Analysis. <br />(3) Equals the lagged depletions from the edge of the gravel pit to the Pine River (200 ft) based on the Glover Analysis, <br />see Appendix D. <br />(4) Equals Column (3) x 43,560 cubic feet per acre foot / (number of days per month x 86,400 seconds per day). <br />Wright Water Engineers, Inc. <br />1/18/2012 <br />Des By: BMN <br />Ckd By: PRF <br />