My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-13_REVISION - C1981012 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2012-03-13_REVISION - C1981012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:07 PM
Creation date
3/14/2012 9:54:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
3/13/2012
Doc Name
Proposed Decision Letter & Form & Cost Estimate
From
DRMS
To
New Elk Coal Company, LLC
Type & Sequence
TR62
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: 120 State: Colorado <br />Date: 2/10/2012 County: Las Animas <br />User: JHB <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Attachment 1: <br />Cost Breakdown: <br />Agency or organization name: DRMS <br />Ownership Cost /Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: $109.00 <br />MATERIAL QUANTITIES <br />Initial volume: 108 CCY <br />Loose volume: 108 LCY <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty): <br />Basic Job Condition Description: BELOW AVERAGE <br />Secondary Job Condition within Basic Description: SEVERE <br />Cycle Time Value: 0.333 minutes <br />Load Bucket Capacity <br />Replace topsoil on zig -zag road <br />Cat 320D L 9' -6" Stick <br />ROPS Cab <br />Source of estimated volume: 0.2 ac. X assume 4" topsoil <br />Source of estimated swell factor: Cat Handbook <br />Rated Capacity: 1.54 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100 -120 %) 1.100 <br />Adjusted Capacity: 1.69 LCY <br />Job Condition Correction Factors Site Altitude: 7700 feet <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />0.87 <br />0.83 <br />0.72 <br />HYDRAULIC EXCAVATOR WORK <br />Permit Action: TR62 Permit /Job #: C1981012 <br />$24.63 <br />$45.70 <br />$38.67 <br />$109.00 <br />Source <br />(CAT HB) <br />(1 shift /day) <br />multiplier <br />Utilization % <br />NA <br />100 <br />NA <br />Horsepower: 148 <br />Weight (MT): 21.55 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Swell factor: 1.000 <br />Unadjusted Hourly Unit Production: 305.23 LCY /Hour <br />Adjusted Hourly Unit Production: 220.40 LCY /Hour <br />Adjusted Hourly Fleet Production: 220.40 LCY/Hour <br />Bucket Size Class: Medium <br />JOB TIME AND COST <br />Fleet size: 1 Excavator Total job time: 0.49 Hours <br />Unit cost: $0.495 /LCY Total job cost: $53.00 <br />Abbreviation: None <br />Filename: C012 -120 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.