My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-13_REVISION - C1981012 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2012-03-13_REVISION - C1981012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:07 PM
Creation date
3/14/2012 9:54:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
3/13/2012
Doc Name
Proposed Decision Letter & Form & Cost Estimate
From
DRMS
To
New Elk Coal Company, LLC
Type & Sequence
TR62
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: 119 State: Colorado <br />Date: 2/10/2012 County: Las Animas <br />User: JHB <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Ripper Attachment: <br />Cost Breakdown: <br />BULLDOZER RIPPING WORK <br />Rip aditional 1220 ft zig zag rd & 1275 ft. slurry line road <br />Permit Action: TR62 Permit/Job #: C1981012 <br />Agency or organization name: DRMS <br />Cat D8T - 8SU <br />3 -Shank Ripper <br />Ownership Cost /Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />$65.28 <br />$102.81 <br />$6.49 <br />$38.49 <br />$213.07 <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Abbreviation: None <br />Filename: C012 -119 <br />Total Fleet Cost/Hour: $213.07 <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA BCY NA <br />Selected estimating method: Area <br />Area: 0.80 acres Rip Depth (ft): 1.00 Volume: 1,291 BCY or CCY <br />Source of estimated quantity: PAP Page 2.05 -7c, Map 12, Map 11 -sheet 1 <br />HOURLY PRODUCTION <br />Seismic: <br />Area: <br />JOB TIME AND COST <br />Fleet size: 1 Ripper(s) <br />Unit cost: $386.879 Per acre <br />Seismic Velocity: NA feet/second <br />Average Ripping Depth: 2.56 mph <br />Average Ripping Width: 7.08 degrees <br />Average Ripping Length: 75.00 feet <br />Average Dozer Speed: 88.00 feet <br />Average Maneuver Time: 0.25 feet <br />Production per unit area: 0.664 acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 0.664 Acres/hr <br />Site Altitude: 7,700 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift /day) <br />Net Correction: 0.83 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />0.55 Acres/hr <br />0.55 Acres/hr <br />Total job time: <br />Total job cost: $310.00 <br />1.45 Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.