Laserfiche WebLink
Ditch . .Name :: .. <br />Approx <br />Stationing <br />Permit ' <br />Description <br />' „ <br />Bottom <br />Width <br />:min:' <br />Depth. <br />li'�',, <br />p e: <br />”" H:1V <br />„ p, <br />{ ' , 'D50, in <br />Final East Pit <br />Vol. 2C, Exh. <br />Ditch, Reach 2 <br />0 +00 to 7 +30 <br />7 -14R <br />12.0 <br />3.0 <br />2.0 <br />12.0 <br />East Taylor <br />38 +33 to <br />Vol. 2C, Exh. <br />Ditch <br />43 +00 <br />7 -14I <br />12.0 <br />3.0 <br />3.0 <br />18.0 <br />Vol. 13, Exh. <br />Trib. D <br />0 +00 to 3 +00 <br />7 -20E <br />12.0 <br />4.0 <br />2.0 <br />12.0 <br />Vol. 13, Exh. <br />Trib. F <br />0 +00 to 6 +30 <br />7 -20E <br />12.0 <br />4.0 <br />2.0 <br />12.0 <br />Colowyo Coal Company <br />2011 Annual Reclamation and Hydrology Report <br />POSTMINING CHANNEL <br />AS -BUILT CERTIFICATION <br />On November 5, 2011, I inspected the completed construction aspects and dimensions of <br />the referenced postmining channels. I inspected the channel alignment, elevations, depth, <br />bottom and size slopes relative to the postmining design. The channel designs are further <br />described in Volume 2C, Exhibit 7 -14 and in Volume 13, Exhibit 7 -20 as further <br />described below. Channel locations are presented on Maps 41 and 41A. <br />This certification applies to: <br />• Final East Pit Ditch, Reach 2, Sta. 0 +00 to 7 +30 <br />• East Taylor Ditch, Sta. 38 +33 to 43 +00 <br />• Trib. D, Sta. 0 +00 to 3 +00, and <br />• Trib. F, Sta. 0 +00 to 6 +30 <br />Following is a summary of the design requirements for these ditch segments. <br />Construction has been completed in accordance with the design requirements and <br />dimensions. In some cases, the ditch width and channel depth is greater than the <br />minimum specified. Rip rap size and placement is acceptable. Most but not all of the <br />design Reach 2 of the Final East Pit Ditch has been completed. The remaining section <br />above approximately Sta. 7 +30 will be completed in the future. <br />Volume 1, Section 4.05.4 of the approved permit specifies that this certification statement <br />must be prepared annually for each completed permanent channel segment. Further, the <br />statement shall be included in the appropriate Annual Reclamation Report. <br />