My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-09_REPORT - C1981019 (10)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2012-03-09_REPORT - C1981019 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:01 PM
Creation date
3/12/2012 8:45:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
3/9/2012
Doc Name
2011 Annual Hydrology & Reclamation Report (1 of 4)
From
Colowyo Coal Company
To
DRMS
Annual Report Year
2011
Permit Index Doc Type
Hydrology Report
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo Coal Company <br />2011 Annual Reclamation and Hydrology Report <br />RULE REQUIREMENT <br />None Apply <br />GENERAL DISCUSSION <br />SECTION 13 - BOND RELEASE <br />On June 25, 2010, Colowyo applied or Phase III bond release of the 1978 -1999 <br />reclaimed areas. A total of 987.32 acres have been applied for under Phase III. This <br />acreage represents areas in the East Pit and West Pit respectively. All Phase III areas <br />have met the ten year minimum period of responsibility and have been shown in the <br />bond release package to meet or exceed the vegetative standards. As of submittal of <br />this Annual Reclamation Report, these Phase III areas applied for have not been <br />released. <br />All previously released Phase I and II areas can be found on Figure 3 -2. <br />Page 13 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.