Laserfiche WebLink
Prepared for <br />CRIPPLE CREEK & VICTOR GOLD MINING COMPANY <br />2755 State Highway 67, P.O. Box 191 <br />Victor, Colorado 80860 <br />FINAL REPORT <br />INTERFACE DIRECT SHEAR TESTING <br />PAD NO. 1- VALLEY LEACH FACILITY <br />Prepared by <br />GEOSYNTEC CONSULTANTS <br />Soil- Geosynthetic Interaction Testing Laboratory <br />5775 Peachtree :Dunwoody Road, Suite 11 D <br />Atlanta, Georgia 30342 <br />Project Number GLI 1126 <br />:25 February 2000 <br />