Laserfiche WebLink
Table 5 -1 <br />Approximate Time Schedule of Construction, Operations, and Reclamation <br />Activity <br />Duration <br />in Years <br />Start Year <br />Complete Year <br />Install and Maintain Erosion Controls — Mine <br />and Overburden Areas <br />29 <br />Continuing <br />2041 or when <br />revegetation is <br />established <br />Clear and Grub Mine Areas <br />11 <br />When <br />needed <br />2020 <br />Construct Haul Roads <br />13 <br />When <br />needed <br />2025 <br />Mining and Ore Loading AGVLF <br />4 <br />Continuing <br />2016 <br />Install Utilities and Prepare Subgrade for <br />SGVLF <br />1 <br />2012 <br />2013 <br />Construct Embankment and Relocate SH 67 <br />1 <br />2012 <br />2013 <br />Construct SGVLF Soil Liner Fill <br />5 <br />2012 <br />2017 <br />Construct High Grade Mill <br />2 <br />2012 <br />2014 <br />Construct SGADR <br />1 <br />2014 <br />2015 <br />Construct SGVLF Liner <br />5 <br />2012 <br />2017 <br />Mining and Ore Loading SGVLF <br />9 <br />2016 <br />2025 <br />Crusher and Conveyor Reclamation <br />1 <br />2026 <br />2026 <br />Mine and Overburden Storage Area <br />Reclamation <br />20 <br />Continuing <br />2032 <br />Complete the Leaching of Ore on the AGVLF <br />12 <br />Continuing <br />2024 <br />Complete Neutralization of AGVLF <br />6 <br />2024 <br />2030 <br />AGADR Facilities <br />2 <br />2039 <br />2041 <br />AGVLF Reclamation <br />2 <br />2031 <br />2032 <br />Complete the Leaching of Ore on the SGVLF <br />17 <br />2016 <br />2033 <br />Complete Neutralization of SGVLF <br />6 <br />2033 <br />2039 <br />SGADR Facilities Reclamation <br />2 <br />2039 <br />2041 <br />SGVLF Reclamation <br />2 <br />2039 <br />2041 <br />Post Closure Monitoring <br />5 <br />2041 <br />2046 <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension 2 <br />5 -5 <br />