new SGVLF will be constructed in two phases in the period 2012 through 2017, with ore <br />placement beginning as early as 2016 on the completed Phase I area. Ore placement on <br />the SGVLF will continue through about 2025, followed by continued recovery for <br />approximately eight years or until roughly 2033. The SGVLF will be neutralized for an <br />approximate six year period followed by reclamation of the SGVLF to begin in about <br />2039. <br />There will be some concurrent reclamation of the site, but most mine area and OSA <br />reclamation will be conducted from about 2026 through 2030 (five years). The AGVLF <br />will be reclaimed from about 2031 to 2034, with the SGVLF reclaimed by approximately <br />2041. Ancillary facilities will be reclaimed, as appropriate, in the period from roughly <br />2033 through 2041. <br />The total period of operation and reclamation for the Cresson Project under MLE2 is <br />approximately 2012 -2041. Table 5 -1 provides an overall estimated schedule for <br />construction, operation, and reclamation of the Cresson Project with the inclusion of <br />MLE2 facilities. Tables 5 -2 and 5 -3 provide the sequence of mining and overburden <br />placement, respectively, in each of the mine areas and OSAs by year. Actual <br />development schedules may vary from those presented below and will be reported in the <br />annual report to OMLR. <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension 2 <br />5 -4 <br />