Laserfiche WebLink
Sodium cyanide will be used in a dilute solution to pull gold from the carbon during carbon <br />stripping. Once the gold is removed by electrowinning, the dilute sodium cyanide solution will <br />be recycled as barren solution. The SGADR will have a contained storage and mixing area for <br />the preparation of the sodium cyanide leaching solution. As at the AGADR, dry sodium cyanide <br />briquettes will be delivered by truck to the site in USDOT- approved containers. The container <br />will be positioned on a concrete bermed unloading area adjacent to the SGADR building within <br />the SGVLF PSSA lined area and a basic water solution will be pumped through the containers to <br />dissolve the briquettes. The dissolved solution will be transferred from the containers into <br />storage tanks that are within the containment area as described above. <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension 2 <br />8 -7 <br />