My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-07_PERMIT FILE - C2010088 (24)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010088
>
2012-03-07_PERMIT FILE - C2010088 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:54:49 PM
Creation date
3/8/2012 1:25:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Permit File
Doc Date
3/7/2012
Doc Name
Union Pacific Track Roadbed Construction Specifications
Section_Exhibit Name
Exhibit 16
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ilNECMI %+ <br />P�CtPIG <br />10.00 - TRACK MATERIAL <br />10.01 Rail - 112 lb. to 141 lb. relay rail is required. Rail must meet or exceed AREMA Class I <br />Specifications if greater than three hundred (300) per year are anticipated. If less than three hundred <br />(300) cars per year are anticipated Class II rail can be used. <br />10.02 Fastenings: <br />a) Angle or Joint Bars, new or certified, to match rail section used. Industry to provide <br />compromise joint bars or compromise welds to match Union Pacific's (UP) rail section at 13- <br />foot clearance point or location designated by UP representative (See UP Standard Drawing <br />No. 0904 and 0948). <br />b) Tie Plates, new or secondhand, and double shouldered plates no smaller than 2 times the base <br />of the rail. Track to be fully plated. The use of single shoulder tie plates is prohibited. <br />c) Track Bolts, new or secondhand, appropriately sized for the boltholes in the rail section with <br />length sufficient for a full nut and heavy -duty spring washers (new) (See UP Standard <br />Drawing No. 0438, 0439, 0440, 0441 & 0442). <br />d) Track Spikes, new 5/8" x 6" or 5/8" x 6 1/4" installed per UP Standard Drawing No. 130005 <br />and 0453. <br />e) Rail Anchors, new or reformed, box anchored every other tie. All switch ties will be <br />completely box anchored. For crosstes that use elastic fasteners, rail anchors are not required <br />(See UP Standard Drawing No. 0460). <br />f) Compromise Joint Bars or Compromise Field Welds shall be utilized when rails of dissimilar <br />rail sections are connected. Turnouts will use the same rail section on the running rail, closure <br />rails, and turnout components through the body of the turnout. It is the Industry's <br />responsibility to furnish, install and maintain compromise joint bars connecting to UP owned <br />track. All rail joints and welds should be kept out of grade crossings, where possible (See UP <br />Standard Drawing No. 0948). <br />44 <br />Class 1 <br />Rail Weight I <br />Max. Vert. Wear I <br />Max. Hor. Wear <br />141 <br />5/16" <br />1/81, <br />133 -136 <br />11411 <br />1/81f <br />131 -132 <br />3/16" <br />1/8" <br />119 <br />5/32" <br />1/16" <br />112 -115 <br />1/8" <br />1/16" <br />Corrugation up to .010 allowed <br />Class 2 <br />Rail Weight I <br />Max. Vert. Wear I <br />Max. Hor. Wear <br />141 <br />7/16" <br />1/4" <br />133 -136 <br />3/8" <br />1/4" <br />131 -132 <br />1/4" <br />1/4" <br />119 <br />1/4" <br />1/811 <br />112 -115 <br />3/16" <br />1/81, <br />Two dime sized engine burns per 39' corrugation up to <br />.020 and 1/4" field size lip allowed <br />10.02 Fastenings: <br />a) Angle or Joint Bars, new or certified, to match rail section used. Industry to provide <br />compromise joint bars or compromise welds to match Union Pacific's (UP) rail section at 13- <br />foot clearance point or location designated by UP representative (See UP Standard Drawing <br />No. 0904 and 0948). <br />b) Tie Plates, new or secondhand, and double shouldered plates no smaller than 2 times the base <br />of the rail. Track to be fully plated. The use of single shoulder tie plates is prohibited. <br />c) Track Bolts, new or secondhand, appropriately sized for the boltholes in the rail section with <br />length sufficient for a full nut and heavy -duty spring washers (new) (See UP Standard <br />Drawing No. 0438, 0439, 0440, 0441 & 0442). <br />d) Track Spikes, new 5/8" x 6" or 5/8" x 6 1/4" installed per UP Standard Drawing No. 130005 <br />and 0453. <br />e) Rail Anchors, new or reformed, box anchored every other tie. All switch ties will be <br />completely box anchored. For crosstes that use elastic fasteners, rail anchors are not required <br />(See UP Standard Drawing No. 0460). <br />f) Compromise Joint Bars or Compromise Field Welds shall be utilized when rails of dissimilar <br />rail sections are connected. Turnouts will use the same rail section on the running rail, closure <br />rails, and turnout components through the body of the turnout. It is the Industry's <br />responsibility to furnish, install and maintain compromise joint bars connecting to UP owned <br />track. All rail joints and welds should be kept out of grade crossings, where possible (See UP <br />Standard Drawing No. 0948). <br />44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.