My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-07_PERMIT FILE - C2010088A (19)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010088A
>
2012-03-07_PERMIT FILE - C2010088A (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:54:50 PM
Creation date
3/8/2012 8:14:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088A
IBM Index Class Name
Permit File
Doc Date
3/7/2012
Doc Name
Performance Bond Requirements
Section_Exhibit Name
Section 3.02
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd <br />Truck Travel (Haut & Return) Time:_ <br />maintained 3.0 <br />Task # 001 Page 3 of 3 <br />Road Condition: Firm smooth. tolling. dWt. surfaced, watered. <br />Seg # Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />Travel <br />Time <br />min <br />( %) <br />(° /a) <br />(fpm) <br />Tttt� <br />3.00 <br />3.00 <br />2874 <br />1.281 <br />Truck Unit Production <br />thin <br />1 3600.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />1.379 <br />Haul Time: 1.379 minutes <br />CtRCES Cost Estimating Software <br />Permit Application 3.02 -5 01/23/2012 <br />Seg # <br />Haut Distance <br />(Ft) <br />Grade VA) <br />Roll. Res <br />0/0 <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />Loading Tool unit <br />1 <br />3600.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />1.281 <br />Truck Unit Production <br />91.55 <br />LCY/Hour Adjusted for job efficiency: <br />CtRCES Cost Estimating Software <br />Permit Application 3.02 -5 01/23/2012 <br />Return Time: 1.281 <br />minutes <br />Total Truck Cycle Time: 5.161 <br />minutes <br />Loading Tool unit <br />Production <br />277.78 <br />LCY/Hour Adjusted for job efficiency: <br />230.56 LCY/Hour <br />Truck Unit Production <br />91.55 <br />LCY/Hour Adjusted for job efficiency: <br />75.99 LCY/Hour <br />Optimal No. of Trucks: <br />3 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 22796 <br />LCY /Hour <br />Adjusted single truck/loader team production: 227.96 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 227.96 <br />LCY/Hour <br />JOB, TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 20.44 <br />Hours <br />Unit cost: <br />$2.989 <br />/LCY Total job cost: $13,926.57 <br />CtRCES Cost Estimating Software <br />Permit Application 3.02 -5 01/23/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.