My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-07_PERMIT FILE - C2010088A (19)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010088A
>
2012-03-07_PERMIT FILE - C2010088A (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:54:50 PM
Creation date
3/8/2012 8:14:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088A
IBM Index Class Name
Permit File
Doc Date
3/7/2012
Doc Name
Performance Bond Requirements
Section_Exhibit Name
Section 3.02
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TrucklLoader Worksheet C <br />Truck Bed (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Volume: <br />ont'd Task # 001 <br />8.00 LCY <br />10.00 LCY <br />9.00 LCY <br />9.41 LCY <br />Final Truck Volume Based on Number of Loader Passes: <br />Loading Tool Capacity <br />Rated Capacity: 2.250 <br />Bucket Fill Factor. 0.875 <br />Adjusted Capacity: 1.%9 <br />Job Condition Corrections: <br />LCY (heaped) <br />Loose material - <br />Page 2 of 3 <br />7.88 LCY <br />Bucket Size Gass: Medium <br />to 3/4"(85 - <br />0.875 <br />Site Altitude (ft.): 4501 feet <br />Net Correction: 1 4.830 1 0.830 1 <br />Loading 'fool Cycle Time: Number of Loading Toot Passes Required to Fill Truck: 4 <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: BELOW AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver. NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): NA <br />Passes <br />minutes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Ad': <br />1.000 <br />1.000 <br />CAT HB <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 1 4.830 1 0.830 1 <br />Loading 'fool Cycle Time: Number of Loading Toot Passes Required to Fill Truck: 4 <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: BELOW AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver. NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): NA <br />Passes <br />minutes <br />Cycle Time Factors <br />0.500 <br />Factor (min.)_ Source <br />(Cat <br />Material: <br />NA <br />NA HB <br />Stockpile: <br />NA <br />NA Cat HB <br />Truck Ownership, <br />NA <br />NA Cat HB <br />Operation: <br />NA <br />NA Cat HB <br />Dump Target: <br />NA <br />NA Cat H$ <br />Net Cycle Ttme Adjustment: NA nunutcs <br />Adjusted Loader Cycle Time: 0.367 minutes <br />Net Load Time per Truck: 1.201 minutes <br />Track Cycle Time: <br />Truck Exchange Time: 0.50 Minutes <br />Truck Load Time: 1.201 Minutes <br />Truck Maneuver and Dump Time: 0.80 Minutes <br />Adjusted for site altitude: <br />0.500 <br />Minutes <br />Adjusted for site altitude: <br />1.201 <br />Minutes <br />Adjusted for site altitude: <br />0.800 <br />Minutes <br />CIRCES Cost Emimating Software <br />Permit Application 3.02-4 01/23/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.