Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 003 Page 3 of <br />Truck Travel (Haul & Returns Time: <br />maintained 3.0 <br />tlikut RniitA' <br />Road Condition: Firm smooth rollina. dirt/It surfaced watered <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />{ %) <br />{ %) <br />J <br />(fpm) <br />Tim <br />3 Truck(s) <br />Adjusted hourly truck team production: 319.19 <br />LCY /Hour <br />Adjusted single truck/loader team production: 230.56 <br />thin <br />1 <br />1500.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />0.635 <br />Haul Time: 0.635 minutes <br />0.Hh 11 Rm'tA- <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />3 Truck(s) <br />Adjusted hourly truck team production: 319.19 <br />LCY /Hour <br />Adjusted single truck/loader team production: 230.56 <br />LCY/Hour <br />1 <br />1500.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />0.550 <br />Return Time: O.M minutes <br />Total Truck Cycle Time: 3.686 minutes <br />Loading Tool unit <br />Production <br />277.78 LCY/Hour Adjusted for job efficiency: <br />230.56 LCY/Hour <br />Truck Unit Production <br />128.19 LCY/Hour Adjusted for job efficiency: <br />106.40 LCY/Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 319.19 <br />LCY /Hour <br />Adjusted single truck/loader team production: 230.56 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 230.56 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: I Team(s) <br />Unit cost: $2.955 /LCY <br />Total job time: 258.21 Hours <br />Total job cost: $175,912.57 <br />CtRCES Cost Estim ting Software <br />Permit Application 3.02 -11 01/23/2012 <br />