Laserfiche WebLink
Ttuck4zader Worksheet Cont'd <br />Task # 003 Page 2 of 3 <br />;wick Bed (volume) Basis: <br />Source <br />Struck Volume: 8.00 <br />LCY <br />Heaped Volume: 10.00 <br />LCY <br />Average Volume: 9.00 <br />LCY <br />Adjusted Volume: 9.41 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes: 7.88 LCY <br />Loading Tool Capacity <br />Bucket Size Class: Medium <br />Rated Capacity: 1250 LCY <br />Bucket Fill Factor: 0.875 Gfl S- <br />Adjusted Capacity: 1.%9 LCY <br />Job Condition Corrections: Site Altitude (ft.): 4500 feet <br />Net Correction: 1 0.830 1 0.830 1 <br />Leading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: BELOW AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders - Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Tune (load, dump, maneuver): <br />4 <br />A inn <br />passes <br />NA minutes <br />Cycle Time Factors <br />Truck ._. <br />Loader <br />Source <br />Altitude Ad": <br />1.000 <br />1.000 <br />(CAT HB <br />Job Efficiency: <br />0.830 <br />0.830 <br />CAT HB <br />Net Correction: 1 0.830 1 0.830 1 <br />Leading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: BELOW AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders - Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Tune (load, dump, maneuver): <br />4 <br />A inn <br />passes <br />NA minutes <br />Cycle Time Factors <br />0.500 <br />Factor min. <br />Source <br />Material: <br />NA <br />NA <br />(Cat HB <br />Stockpile: <br />NA <br />NA <br />Cat HB <br />Truck Owners ' E <br />; NA <br />NA <br />Cat HB <br />Operation: <br />' NA <br />i NA <br />(Cat HB) <br />Dump Target: <br />NA - <br />NA <br />Cat HB <br />Net Cycle Time Adjustment: NA minutes <br />Adjusted Loader Cycle Time: 0367 minutes <br />Net Goad Time per Truck: 1.201 minutes <br />Truck Cycle 'me: <br />Truck Exchange Time: 0.50 Minutes <br />Truck Load Time: 1.201 Minutes <br />Truck Maneuver and Dump Time: 0.80 Minutes <br />Adjusted for site altitude: <br />0.500 <br />Minutes <br />Adjusted for site altitude: <br />1.201 <br />Minutes <br />Adjusted for site altitude: <br />0.800 <br />Minutes <br />CtRCES Cast Estimating Seftwam <br />Permit Application 3.02 -10 01/23/2012 <br />