My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-06_PERMIT FILE - C1982057 (32)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982057
>
2012-01-06_PERMIT FILE - C1982057 (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:13 PM
Creation date
3/7/2012 8:16:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
1/6/2012
Section_Exhibit Name
Tab 25 Bonding
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Engineering Redesign Fee <br />The reclamation plan as submitted is based on a planned life-of-mine operation. If mining should cease <br />before the planned date, some projects may need to be re-engineered or field engineered. To account <br />for these costs, Graph t, OSMRE Handbook was used to estimate these fees. This was estimated at <br />4.25 percent of the contract amount (direct and indirect costsl. <br />Contractor's Profit and Overhead <br />Profit and overhead for the contractor was estimated using Graph 2, OSMRE Handbook. This was <br />estimated at 10 percent of the direct costs. <br />Reclamation Management Fee <br />This fee represents the cost for management of the entire project. Usually a firm specializing in <br />reclamation oversight performs this. This was estimated per Graph 3, OSMRE Handbook at 3.25 <br />percent of the direct costs. <br />Public Liability Insurance <br />protects the Contractor against his legal liability to third persons for b y injury and <br />e arising out of his own operations. This cost has been estimat at 1.55 percent of <br />the direct <br />The performance bond guarantees the <br />to the satisfaction of the Division. Thi <br />COST SUMMARY <br />be performed and the reclamation will be conducted <br />been estimated at 1.05 percent of the direct costs. <br />The current b estimate demonstrates that the entire permit a can be reclaimed for Sg,707,373. <br />SCC ha ubmitted a surety certificate raising the current reclamatio bond to this amount. The bond <br />requ ment will be adjusted as appropriate based on the DMG calculated imate for PR-05. <br />PR-05 <br />7 <br />Revised 05/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.