My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-24_PERMIT FILE - M2011034 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011034
>
2012-02-24_PERMIT FILE - M2011034 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:49:00 PM
Creation date
3/6/2012 3:02:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011034
IBM Index Class Name
PERMIT FILE
Doc Date
2/24/2012
Doc Name
COST SUMMARY WORK
From
DRMS
To
OPERATOR
Email Name
RCO
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loader Worksheet Cont'd Task # 002 Page 2 of 2 <br />Load Bucket Capacity <br />Rated Capacity: 3.90 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100 -120 %) 1.100 <br />Adjusted Capacity: 4.29 LCY <br />Job Condition Correction Factors <br />Site Altitude: 7700 feet <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />1.00 <br />0.83 <br />0.83 <br />Source <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />Total Travel Time: 0.4348 minutes <br />Total Cycle Time: 0.8773 minutes <br />Unadjusted Hourly Unit Production: 293.41 LCY/Hour <br />Adjusted Hourly Unit Production: 243.53 LCY/Hour <br />Adjusted Hourly Fleet Production: 243.53 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 4.56 Hours <br />Unit cost: $0.402 /LCY Total job cost: $447.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.