My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-24_PERMIT FILE - M2011034 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011034
>
2012-02-24_PERMIT FILE - M2011034 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:49:00 PM
Creation date
3/6/2012 3:02:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011034
IBM Index Class Name
PERMIT FILE
Doc Date
2/24/2012
Doc Name
COST SUMMARY WORK
From
DRMS
To
OPERATOR
Email Name
RCO
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time Factors <br />Length <br />(feet) <br />Factor (min) <br />Source <br />Material: <br />Material 3/4" to 6" diameter 0.00 <br />0.000 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high and up 0.00 <br />0.000 <br />(Cat HB) <br />Truck Ownership: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Task description: <br />Site: Pepper Pit <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />HOURLY PRODUCTION <br />Loader Cycle Time: <br />Haul and Return Time <br />WHEEL LOADER - LOAD AND CARRY WORK <br />Carry fill for berm construction <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 2/23/2012 County: Rio Grande <br />User: RCO <br />Agency or organization name: DRMS <br />Total Fleet Cost/Hour: $97.90 <br />Loose volume: 1,111 LCY <br />Permit Action: New 110 Permit/Job #: M2011034 <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 938H Horsepower: 172 <br />Attachment 1: ROPS Cab Shift Basis: 1 per day <br />Data Source: (CRG) <br />$22.07 <br />$37.34 <br />$38.49 <br />$97.90 <br />Utilization % <br />NA <br />100 <br />NA <br />MATERIAL QUANTITIES <br />Initial volume: 1,111 CCY Swell factor: 1.000 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Unadjusted Basic Cycle Time (load, dump, maneuver): <br />Net Cycle Time Adjustment: <br />Adjusted Basic Cycle Time: 0.443 <br />Rolling Resistance — Road Conditions <br />Haul: Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br />Return: Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: M034 -002 <br />-0.040 <br />0.483 <br />minutes <br />minutes <br />minutes <br />CIRCES Cost Estimating Software <br />Length <br />(feet) <br />Grade Res. <br />( %) <br />Rolling <br />Res. ( %) <br />Total Res. <br />( %) <br />Travel Time <br />(minutes) <br />Source <br />Haul Route: <br />300 <br />0.00 <br />2.00 <br />2.00 <br />0.2234 <br />(Cat HB) <br />Return Route: <br />300 <br />0.00 <br />2.00 <br />2.00 <br />0.2114 <br />(Cat HB) <br />Task description: <br />Site: Pepper Pit <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />HOURLY PRODUCTION <br />Loader Cycle Time: <br />Haul and Return Time <br />WHEEL LOADER - LOAD AND CARRY WORK <br />Carry fill for berm construction <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 2/23/2012 County: Rio Grande <br />User: RCO <br />Agency or organization name: DRMS <br />Total Fleet Cost/Hour: $97.90 <br />Loose volume: 1,111 LCY <br />Permit Action: New 110 Permit/Job #: M2011034 <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 938H Horsepower: 172 <br />Attachment 1: ROPS Cab Shift Basis: 1 per day <br />Data Source: (CRG) <br />$22.07 <br />$37.34 <br />$38.49 <br />$97.90 <br />Utilization % <br />NA <br />100 <br />NA <br />MATERIAL QUANTITIES <br />Initial volume: 1,111 CCY Swell factor: 1.000 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Unadjusted Basic Cycle Time (load, dump, maneuver): <br />Net Cycle Time Adjustment: <br />Adjusted Basic Cycle Time: 0.443 <br />Rolling Resistance — Road Conditions <br />Haul: Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br />Return: Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: M034 -002 <br />-0.040 <br />0.483 <br />minutes <br />minutes <br />minutes <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.