Laserfiche WebLink
February 23, 2012 C- 1981- 012/New Elk Mine JHB <br />Ditches, sumps and SAES located at the Load out were in good repair and graded appropriately. Coal stockpile is <br />quite full but coal material remains stored in the appropriate location and all coal material is contained within the <br />sediment control system. <br />DOCUMENTS RECEIVED None <br />OTHER (SPECIFY) NA <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 5 of 8 <br />