Laserfiche WebLink
EXHIBIT B - Site Description <br />(a) <br />(c) <br />EXHIBIT C - Mining Plan <br />(a) <br />(b) <br />(c) <br />(e) <br />a description of the vegetation and soil characteristics in the area of the proposed operation. <br />The local office of the Soil Conservation Service (SCS) may provide you with this <br />information as well as recommendations for Exhibit D - Reclamation Plan; <br />(b) identify any permanent man -made structures within two hundred (200) feet of the affected <br />area and the owner of each structure. Each structure should be located on Exhibit E - Map; <br />a description of the water resources in the area of the proposed operation. Identify any <br />streams, springs, lakes, stock water ponds, ditches, reservoirs, and aquifers that would <br />receive drainage directly from the affected area. Provide any information available from <br />publications or monitoring data on flow rates, water table elevations and water quality <br />conditions; and <br />specify the estimated dates that mining will commence and end. If the operation is intended <br />to be an intermittent operation as defined in C.R.S 34- 32.5- 103(11)(b), the Applicant should <br />include in this exhibit a statement that conforms to the provisions of Section 34- 32.5 - <br />103(11)(b), C.R.S.; <br />the estimated depth to which soil, suitable as a plant growth medium, will be salvaged for <br />use in the reclamation process. This description must be consistent with information <br />provided in Exhibit B. Sufficient soil must be salvaged to meet the vegetation establishment <br />criteria of Rule 3.1.10. If plant growth medium is not reapplied on a graded area <br />immediately after salvage, then the Operator /Applicant must specify how the topsoil will be <br />stockpiled and stabilized with a vegetative cover or other means until used in reclamation. <br />Plant growth medium stockpiles must be located separate from other stockpiles, out of the <br />way of mine traffic and out of stream channels or drainage ways. The location of plant <br />growth medium stockpiles must be shown on Exhibit E - Map; <br />specify the thickness of overburden or quantity of waste rock, if any, to be removed to reach <br />the deposit. The location of any overburden stockpiles or waste rock fills must be shown on <br />Exhibit E - Map; <br />(d) specify the thickness of the deposit to be mined; <br />describe the major components of the mining operation such as: roads and access routes, pit, <br />office, shop /maintenance buildings, plant, processing facilities, and any underground <br />openings such as adits or ventilation facilities. These components must be located on <br />Exhibit E - Map; <br />Page 3 of 7 <br />