Laserfiche WebLink
Plan Year <br />2011 <br />Month <br />Net <br />Evaporative <br />Losses <br />(acre -feet) <br />Total <br />Operational <br />Losses <br />(acre -feet) <br />Total <br />Losses <br />from <br />Evans #2 Pit <br />(acre -feet) <br />Lagged <br />Stream <br />Depletions <br />(acre -feet) <br />AGUA <br />Replacement <br />Credits <br />(acre -feet) <br />April -11 <br />1.79 <br />3.02 <br />4.81 <br />1.61 <br />1.60 <br />May -11 <br />2.36 <br />3.02 <br />5.38 <br />2.43 <br />2.40 <br />June -11 <br />2.94 <br />1.55 <br />4.48 <br />2.95 <br />3.00 <br />July -11 <br />2.78 <br />1.55 <br />4.33 <br />3.17 <br />3.20 <br />August -11 <br />2.47 <br />1.55 <br />4.02 <br />3.33 <br />3.30 <br />September -11 <br />2.01 <br />1.55 <br />3.56 <br />3.38 <br />3.40 <br />October -11 <br />1.43 <br />1.55 <br />2.98 <br />3.32 <br />3.30 <br />November -11 <br />0.78 <br />0.00 <br />0.78 <br />3.00 <br />3.00 <br />December -11 <br />0.56 <br />0.00 <br />0.56 <br />2.41 <br />2.40 <br />January -12 <br />0.59 <br />0.00 <br />0.59 <br />2.03 <br />2.00 <br />February -12 <br />0.71 <br />0.00 <br />0.71 <br />1.77 <br />1.80 <br />March -12 <br />1.02 <br />1.55 <br />2.56 <br />1.76 <br />1.80 <br />Total <br />19.42 <br />15.33 <br />34.75 <br />31.17 <br />31.20 <br />Deere & Ault Consultants, Inc. <br />LAGGED DEPLETIONS AND PROPOSED REPLACEMENTS <br />Evans #2 Pit <br />2011 Plan Year <br />(1) <br />(2) <br />Table 3 (Revised) <br />(3) <br />(4) <br />(5) <br />Notes: <br />(I) Equals Column (7), Table 1. <br />(2) Equals Column (4), Table 2. <br />(3) Equals the sum of Columns (1) and (2). <br />(4) Based on Glover Calculations (T= 100,000; s =0.2; X =2400; W= 5000). <br />(5) Fully Consumable recharge credits from AGUA's Excelsior Recharge Ponds <br />3/29/2011 P \0183 Evans 112 Pit \007 2011 SWSP Renewal \2011 Evans #2 SWSP Tables (Revised 3_29_11) xls <br />