Laserfiche WebLink
Plan Year <br />2011 <br />Month <br />Amount of <br />Aggregate <br />Production <br />(tons) <br />Water Lost <br />With Mined <br />Aggregate <br />(acre -feet) <br />Water Used <br />for Dust <br />Control <br />(acre -feet) <br />Total <br />Operational <br />Losses <br />(acre -feet) <br />April <br />100,000 <br />2.94 <br />0.08 <br />3.02 <br />May <br />100,000 <br />2.94 <br />0.08 <br />3.02 <br />June <br />50,000 <br />1.47 <br />0.08 <br />1.55 <br />July <br />50,000 <br />1.47 <br />0.08 <br />1.55 <br />August <br />50,000 <br />1.47 <br />0.08 <br />1.55 <br />September <br />50,000 <br />1.47 <br />0.08 <br />1.55 <br />October <br />50,000 <br />1.47 <br />0.08 <br />1.55 <br />November <br />0 <br />0.00 <br />0.00 <br />0.00 <br />December <br />0 <br />0.00 <br />0.00 <br />0.00 <br />January <br />0 <br />0.00 <br />0.00 <br />0.00 <br />February <br />0 <br />0.00 <br />0.00 <br />0.00 <br />March <br />50,000 <br />1.47 <br />0.08 <br />1.55 <br />Total <br />500,000 <br />14.72 <br />0.61 <br />15.33 <br />(1) <br />Table 2 <br />OPERATIONAL LOSSES <br />Evans #2 Pit <br />2011 Plan Year <br />( <br />(3) <br />(4) <br />Notes: <br />(1) Projected mining provided by Fremont Paving & Redi -Mix. <br />(2) Column (2) times 2000 times 4% divided by 62.4 divided by 43,560. <br />(3) Based on 25,000 gallons per month as provided by Fremont Paving & Redi -Mix. <br />(4) Equals the sum of Columns (2) and (3). <br />Deere & Ault Consultants, Inc. 3/29/2011 P \0183 Evans #2 Pit \007 2011 SWSP Renewal \2011 Evans #2 SWSP Tables (Revised 3_29_11) xls <br />