Laserfiche WebLink
1981 <br />68.7 <br />Non - Seeded > <br />68.7 <br />10 Years or <br />2 <br />Less <br />15.6 <br />15.6 <br />1984 <br />20.0 <br />20.0 <br />20.0 <br />20.0 <br />1986 <br />84.1 <br />84.1 <br />84.1 <br />84.1 <br />1987 <br />88.2 <br />88.2 <br />88.2 <br />88.2 <br />1988 <br />132.2 <br />132.2 <br />121.7 <br />121.7 <br />1989 <br />9.7 <br />9.7 <br />9.7 <br />9.7 <br />1991 <br />2.7 <br />2.7 <br />2.7 <br />2.7 <br />1992 <br />31.7 <br />31.7 <br />31.7 <br />31.7 <br />1993 <br />28.7 <br />28.1 <br />56.8 <br />56.8 <br />56.8 <br />1994 <br />85.1 <br />49.0 <br />134.1 <br />134.1 <br />134.1 <br />1995 <br />24.8 <br />24.8 <br />24.8 <br />24.8 <br />1996 <br />457.2 <br />457.2 <br />453.0 <br />453.0 <br />Year <br />Seeded > <br />Non - Seeded > <br />Total > <br />10 Years or <br />2 <br />Less <br />Greater Than 10 <br />2 <br />Years <br />Cumulative <br />2 <br />Total <br />Table 4. Seeded Acreage Summary <br />Totals <br />1001.4 <br />108.8 <br />1110.2 <br />0.0 <br />1042.4 <br />1042.4 <br />Table 4 provides an annual accrual of acreage seeded at the mine. The Seeded Areas are <br />illustrated on Exhibit 2; Topsoiled and Seeded Summary. <br />Notes: <br />1. The values provided above were determined by reconciling all known records at the Edna <br />Mine. While these values may not be consistent with values provided in previous annual <br />reclamation reports, they do represent the areas provided on Exhibit 4.4 -2 of the permit <br />with the exception of the value provided above for 1991. Exhibit 4.4 -2 indicates this <br />acreage as 1990 (Moffat Pond embankment). Most of the other discrepancies are the <br />result of mapping and measurement errors, and oversights (i.e., miscellaneous acreage <br />omitted or assigned to the incorrect year) in previous years. It should also be noted that <br />this reconciliation does not impact the bond liability period for any areas as the extended <br />liability for all areas began on January 1, 1997. <br />2. Excludes acres where Phase III has been achieved. Bond Release Number SL -5 has <br />reached Bond Phase III. This decreased the Cumulative Total by 53.1 acres for 1981 and <br />by 10.5 acres for 1988. Bond Release Number SL -8 has reached Bond Phase III. This <br />decreased the Cumulative Total by 4.2 acres for 1996. Only a portion of Bond Release <br />Number SL -8 was seeded. <br />iik"' WWCENGINEERING <br />Page 6 <br />