Laserfiche WebLink
Stockpiled <br />273.5 <br />245.4 <br />Live Handled, Roto - Cleared <br />215.0 <br />215.0 <br />Live Handled, Non -Roto- Cleared <br />61.60 <br />61.60 <br />Table 3. Topsoiled Acreage Summary <br />Total <br />Cumulative Total 1 <br />Totals <br />550.1 <br />522.0 <br />Table 3 summarizes all Topsoiled Acreage at the Edna Mine. The Topsoiled Areas are <br />illustrated on Exhibit 2; Topsoiled and Seeded Summary. <br />Notes: <br />1. Excludes acres where Phase III has been achieved. Bond Release Number SL -5 has <br />reached Bond Phase III. This decreased the Stockpiled Cumulative Total by 26.1 acres, <br />the Physical Descriptions Portion of Center Ridge and South of Shop were Stockpiled. <br />Bond Release Number SL -8 has reached Bond Phase III. This decreased the Stockpiled <br />Cumulative Total by 2.0 acres. Only a portion of Bond Release Number SL -8 was <br />Stockpiled. <br />^A. WWCENGINEERING <br />Page 5 <br />