My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1982056 (12)
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
_INSPECTION - C1982056 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2020 8:57:43 AM
Creation date
2/10/2012 9:13:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DRMS
To
Jerry Nettleton
Inspection Date
2/6/2012
Email Name
JDM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 6, 2012 C-1982-056/Foidel Creek Mine JDM <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection R -Roads <br /> N -Availability of Records N -Reclamation Success <br /> N -Backfill &Grading N -Revegetation <br /> N -Excess Spoil and Dev.Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish &Wildlife Y - Support Facilities On-site <br /> R -Hydrologic Balance N - Signs and Markers <br /> R -Gen. Compliance With Mine Plan NA - Support Facilities Not On-site <br /> R -Other NA - Special Categories Of Mining <br /> R -Processing Waste R -Topsoil <br /> COMMENTS <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, <br /> 4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring <br /> 4.05.13; Drainage —Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> Due to construction of the CRDA being completed in phases, initial perimeter ditches are constructed as <br /> temporary ditches. Permanent ditches have been designed,but are not constructed due to the initial stages of <br /> CRDA construction. All temporary CRDA ditches were snow-covered at the time of the inspection. No problems <br /> were noted. <br /> The CRDA has been designed with a toe-drain to prevent any significant build-up of hydrostatic pressure within <br /> the pile. The toe-drain is designed to discharge into the Area 41 Pit. The Northern end of the toe-drain has been <br /> covered with refuse and a small trickle of discharge was noted at the outlet and into the Area 41 Pit. No problems <br /> were noted. <br /> Number of Partial Inspection this Fiscal Year: 8 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.