My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-02_REVISION - C1992081 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2012-02-02_REVISION - C1992081 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:48:19 PM
Creation date
2/2/2012 10:36:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
REVISION
Doc Date
2/2/2012
Doc Name
Phase 1 Bond Release Request
From
Hayden Gulch Terminal
To
DRMS
Type & Sequence
SL1
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HAYDEN GULCH LOADOUT <br />SL -01 Phase I Bond Release Request Cost Summary <br />(DRMS Bond Calculation 7/22/10 & 9/16/11) <br />Direct Costs <br />Task <br />No. <br />Task Description <br />DRMS <br />Bond Cost <br />Requested <br />Release <br />001 <br />Regrade Rail Loop <br />$43,514 <br />$0 <br />002 <br />Regrade Rail Spur <br />$30,627 <br />$0 <br />003 <br />Regrade Facilities Area <br />$16,888 <br />$16,888 <br />006 <br />Rip Facilities Area <br />$4,020 <br />$4,020 <br />007 <br />Rip Haul Roads <br />$992 <br />$992 <br />008 <br />Rip Ramp Roads <br />$819 <br />$819 <br />011 <br />Regrade Haul Roads <br />$2,815 <br />$2,815 <br />012 <br />Regrade Ramp Roads <br />$2,064 <br />$2,064 <br />015 <br />Finish Grade Disturbed Area <br />$9,435 <br />$1,064 <br />018 <br />Regrade Truck Loop Pond <br />$469 <br />$0 <br />019 <br />Regrade Rail Loop Pond <br />$1,568 <br />$0 <br />020 <br />Regrade All Ditches <br />$4,691 <br />$0 <br />021 <br />Regrade Leach Field <br />$1,877 <br />$0 <br />024 <br />Replace Topsoil on Rail Loop and Facilities Area <br />$79,154 <br />$0 <br />025 <br />Replace Topsoil of Rail Spur <br />$14,778 <br />$0 <br />028 <br />Sea Alluvial Wells HGDAL -1, -2, -3 <br />$373 <br />$0 <br />031 <br />Drill Seed Mix #1 <br />$49,678 <br />$0 <br />032 <br />Drill Seed Mix #2 <br />$1,807 <br />$0 <br />033 <br />Drill Seed Mix #3 <br />$45,338 <br />$0 <br />034 <br />Hydroseed Mix #3 <br />$3,177 <br />$0 <br />037 <br />Demolish and Remove Structures (see details below ) <br />$521,464 <br />$366,717 <br />040 <br />Clean Sediment Ponds Once During Liability Period <br />$3,179 <br />$0 <br />041 <br />Site Maintenance <br />$10,335 <br />$0 <br />045 <br />Mob /Demob- Combined Tasks <br />$8,041 <br />$0 <br />501 <br />Rip TAHR <br />$30,867 <br />$0 <br />502 <br />Remove TAHR Surface Material to Pit <br />$148,577 <br />$0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.