Laserfiche WebLink
• As allowed by the Army Corp. of Engineers the flood control berm along the <br />river on the east side of the property will be allowed to stay as is, with the <br />exception of removal of dead trees that are scattered around the area. We <br />will also clean up the profile of the berm in places where equipment has <br />moved material. Also we are creating a River access point at the North -east <br />corner of the property. <br />• As required by the plan we will address, the REC concerns from the EAS. <br />We will be hauling off all of the household waste to the land fill. The shed by <br />the lake will be removed and the pump and electrical equipment will be <br />salvaged for other uses. Area will be cleaned and reclaimed. As for the white <br />material that is Alkali and is a natural occurring process for the soil <br />conditions and will be addressed by putting compost on it to absorb and <br />neutralize. As a natural occurrence in our area, it is considered a non <br />hazardous material. <br />The total project is scheduled to be completed in 5 years, as budget and man power <br />allows. Enclosed you will find a map depicting the purposed location of roads, trails, <br />picnic areas, future play ground and parking areas. The map also will show the <br />location of the waste piles to be removed. Also included is the original reclamation <br />plan. The exact locations are not to scale. <br />Respectfully, <br />Paul D. Suppes, Parks Director <br />City of Delta Co. <br />970 -874 -7973 <br />