Laserfiche WebLink
1.200 <br />(SLOT) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(SSD -AC) <br />1.225 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />1.438 <br />(CAT HB) <br />Bulldozer Worksheet Cont'd <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Net correction: 1.0527 <br />Adjusted unit production: 397.71 LCY /hr <br />Adjusted fleet production: 397.71 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.562 /LCY <br />Total job time: 2.60 Hours <br />Total job cost:' $580.89 <br />Task # 002 <br />Page 2 of 2 <br />CIRCES Cost Estimating Softls <br />