Laserfiche WebLink
Task description: Apply 0.6 inches of top soil over 0.672 acres <br />Site: Schuler Construction Pit # 1 <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 1/19/2012 <br />User: BMK <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Horsepower: 310 <br />Blade Type: Semi - Universal <br />Attachment: 1 -shank ripper <br />Shift Basis: I per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost /Hour: <br />Operating Cost /Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $223.36 <br />Total Fleet Cost /Hour: $223.36 <br />MATERIAL QUANTITIES <br />Initial Volume: 724 <br />Swell factor: 1.429 <br />Loose volume: 1.034 LCY <br />$65.94 <br />$109.17 <br />$9.76 <br />$38.49 <br />HOURLY PRODUCTION <br />Average push distance: 250 feet <br />Unadjusted hourly production: 377.8 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: -10 % <br />Average site altitude: 4,732 feet <br />Material weight: 1,600 lbs /LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />BULLDOZER WORK <br />Page 1 of 2 <br />Permit Action: Required warranty <br />calculation Permit /Job #: M2005002 <br />State: Colorado Abbreviation: None <br />County: El Paso <br />Utilization <br />NA <br />100 <br />100 <br />NA <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />0.750 <br />1.000 <br />Source <br />(AVG.) <br />(CAT HB) <br />Filename: M002 -002 <br />CIRCES Cost Estimating. Software <br />