Laserfiche WebLink
Task description: <br />Site: Schuler Construction Pit # 1 <br />PROJECT IDENTIFICATION <br />Task #: 001 <br />Date: 1/20/2012 <br />User: BMK <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Ownership Cost /Hour: <br />Operating Cost /Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost /Hour: $22336 <br />Total Fleet Cost/Hour: $223.36 <br />MATERIAL QUANTITIES <br />Initial Volume: 832 <br />Swell factor: 1.250 <br />Loose volume: 1,040 LCY <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Cut slopes to 3:1 and grade pit floor <br />Permit Action: Required Financial <br />Warranty Calculation Permit /Job #: M2005002 <br />State: Colorado <br />County: El Paso <br />Agency or organization name: DRMS <br />Cat D8T - 8SU <br />310 <br />Semi - Universal <br />1 -shank ripper <br />1 per day <br />(CRG) <br />$65.94 <br />$109.17 <br />$9.76 <br />$38.49 <br />HOURLY PRODUCTION <br />Average push distance: 175 feet <br />Unadjusted hourly production: 562.2 LCY /hr <br />-5 <br />4,732 feet <br />2 ,550 lbs /LCY <br />Weight description: Earth - Dry packed <br />BULLDOZER WORK <br />0.750 <br />0.900 <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Source <br />(AVG.) <br />(CAT HB)) <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: M002 -001 <br />CIRC'ES Cost Estimating Software <br />