Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />1 <br />a N <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />cut slopes to 3:1 garde pit floor <br />DOZER <br />3.50 <br />S679.00 <br />$580.00 <br />$509.05 <br />$487.00 <br />apply 6 inches of top soil over 0.672 acres <br />DOZER <br />2.60 <br />revege 0.672 acres <br />REVEGE <br />14.00 <br />mob /demob <br />MOBILIZE <br />4.50 <br />SUBTOTALS: <br />24.6 <br />1 $ $2,255.05 <br />Task description: Cost Summary <br />Site: Schuler Construction Pit # 1 <br />PROJECT IDENTIFICATION <br />Task #: 004 <br />Date: 1/20/2012 <br />User: BMK <br />TASK LIST (DIRECT COSTS) <br />Permit Action: Reuired warranty <br />calculation Permit/Job #: M2005002 <br />State: Colorado <br />County: El Paso <br />Agency or organization name: DRMS <br />COST SUMMARY <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />Engineering work and /or contract/bid preparation: <br />Reclamation management and /or administration: <br />500.00 <br />0.00 <br />0.00 <br />Abbreviation: None <br />Filename: M002 -004 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 0.00 Total = $0.00 <br />Performance bond: 1.05 Total = $23.68 <br />Job superintendent: 0.00 Total = $0.00 <br />Profit: 10.00 Total = $225.51 <br />TOTAL O & P = _ $249.19 <br />CONTRACT AMOUNT (direct + O & P) _ $2,504.24 <br />Total = 500.00 <br />Total = $0.00 <br />$0.00 <br />CONTINGENCY: 3.00 Total = S67.65 <br />TOTAL INDIRECT COST = $816.84 <br />TOTAL BOND AMOUNT (direct + indirect) _ 53,071.89 <br />