Slurry Wall and Zoned Clay Liner Options
From
Loloff Construction, Inc.
To
DRMS
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Clay Core Material <br />CY <br />567886.4 <br />$2.25 <br />$1,277,744 40 <br />A clay liner must be keyed into bedrock in order to be effective. This <br />estimate assumes a minimum zoned clay liner configuration that is keyed <br />into the bedrock This zoned liner configuration assumes a 12 foot top <br />width and a 21 slope It also assumes the mining highwall is 0 5 1 <br />Embankment Shell <br />CY <br />378590.9 <br />$1.25 <br />$473,238.63 <br />Assumes only the backfilled portion of the embankment (20 feet) to be <br />seeded. <br />Removal of Excess Material (Below 40 feet) to Bedrock <br />CY <br />884671.3 <br />$9.00 <br />$7,962,041.70 <br />If mining is only feasible to 40 feet, the remaining 11 feet (average <br />additional depth to bedrock) must be excavated and removed from the site <br />to key clay liner into bedrock <br />Seed and Mulch <br />Ac <br />3.4 <br />$675.00 <br />$2,295.00 <br />Assumes only the backfilled portion of the embankment (25 feet) to be <br />seeded <br />Reseed (Assume 20% Reseed) <br />Ac <br />0.7 <br />$675.00 <br />$459 00 <br />Dewatering <br />Monthly <br />360.0 <br />$10,000.00 <br />$3,600,000 00 <br />Assumes a 30 year mining and reclamation to install clay liner Pumping <br />costs do combine costs associated with mining as well as costs associated <br />with reclamation. Actual costs for pumping exclusively for installation of <br />clay liner may be significantly less than this estimate <br />Geotechnical <br />1.0 <br />$10,000.00 <br />$10,00000 <br />Subtotal <br />$13,325,778 73 <br />Engineering (10%) <br />$1,332,577.87 <br />Mobilization (5 %) <br />$666,288 94 <br />Construction Observation (10%) <br />$1,332,577.87 <br />Testing (2 %) <br />$266,515.57 <br />Construction Staking (1 %) <br />$133,257 79 <br />Contingency (30%) <br />$3,997,733 62 <br />TOTAL <br />$21,054,730.39 <br />Slurry Wall <br />Sq -Ft <br />347014.0 <br />$3.50 <br />$1,214,549.00 <br />Estimate based on vertical slurry wall to 7 feet below bedrock Average <br />bedrock assumed to be 51 feet based on Empire Laboratories Report of a <br />Mineral Evaluation (Feb 9, 1981) <br />Dewatering <br />Monthly <br />1.0 <br />$10,000.00 <br />$10,000.00 <br />Backfilling to a 3 1 Slope <br />CY <br />664777.8 <br />$1.25 <br />$830,972.25 <br />This assumes a 25 foot top width <br />Seed and Mulch <br />Ac <br />3.4 <br />$675.00 <br />$2,295.00 <br />Assumes only the backfilled portion of the embankment (25 feet) to be <br />seeded. <br />Reseed (Assume 20% Reseed) <br />Ac <br />0.7 <br />$675.00 <br />$459.00 <br />Geotechnical <br />1.0 <br />$10,000.00 <br />$10,000 00 <br />Subtotal <br />$2,068,275 25 <br />Engineering (10%) <br />$206,827.53 <br />Mobilization (5 %) <br />$103,413.76 <br />Construction Observation (10%) <br />$206,827.53 <br />Testing (2 %) <br />$41,36551 <br />Construction Staking (1 %) <br />$20,682 75 <br />Contingency (30%) <br />$620,482 58 <br />TOTAL <br />$3,267,874.90 <br />Loloff Pit Preliminary Cost Estimate <br />Slurry Wall and Zoned Clay Liner Reservoir <br />Engineer's Opinion of Probable Cost <br />DESCRIPTION <br />Slurry Wall Option <br />Clay Liner Option <br />TM:" Appl <br />Group, <br />UNIT <br />TYPE <br />Units UNIT COST ESTIMATED COST <br />Notes <br />