Laserfiche WebLink
- 4 holes to be drilled as shown on the attached sheet. <br />- each hole is to be 50 -60 feet deep. <br />- we will have an engineer /geologist on site to log the holes and take samples. <br />- the gravel is expected to have some material of 12" size. <br />- water is expected to be encountered within 5' to 10' from the surface. <br />If you approve this proposal, please let us know what availability you have to be present <br />during the sampling. We prefer that you are present for that work. <br />Sincerely, <br />,e,,,,L <br />Greg Lewicki, P.E. <br />Greg Lewicki and Associates <br />