Laserfiche WebLink
. Ancillary Facilities <br />• <br />A 29 -foot by 62 -foot mobile trailer is proved to house office and change <br />facilities. The office /change building is located along the western margin <br />of the facilities area. The trailer is insulated, electrically heated, <br />lighted and ventilated. In 2007, as part of MR -15, HGTI installed a 12 -foot <br />by 60 -foot mobile trailer to house additional office spaces. This trailer <br />will be immediately adjacent to the existing office /change building trailer. <br />Its location is shown on Exhibit 12 -2, Surface Water Control Plan Map <br />(Revision 11, dated 03/07). This temporary trailer will also be insulated, <br />electrically heated, lighted and ventilated. It will not have a water or <br />sewage system. <br />Other ancillary facilities include the following: <br />• 2 Powerhouses, one adjacent to the crusher building (on the northwest <br />side) and the second next to the train loadout structure - these <br />buildings are shown on Exhibit 12 -1 (Revision 9, dated 8/99) and <br />Exhibit 12 -2 (Revision 5, dated 6199) as "metal building." <br />• Water storage tank <br />• Dust suppression pressure tank building, which is located adjacent to <br />the water storage tank - this building is shown on Exhibit 12 -1 <br />(Revision 9, dated 8/99) and Exhibit 12 -2 (Revision 5, dated 8/99) as <br />"metal building." <br />• Dust suppression system building, which is located adjacent to the <br />crusher building (on the southeast side) - this building is shown on <br />Exhibit 12 -1 (Revision 9, dated 8/99) and Exhibit 12 -2 (Revision 5, <br />dated 8/99) as "metal building." <br />MR -15 7 Revised 03/07 <br />